POTTSTOWN PA – A tentative schedule for milling and paving operations on 12 Pottstown streets began Monday (Sept. 30, 2024) and is expected to continue through the week of Oct. 14 (Monday), the borough announced.
The schedule depends in part on acceptable weather. Drivers likely should use caution when traveling through or near work zones. Glasgow Inc. of Glenside PA is the borough’s designated contractor for the project.
Affected during the two-week period are:
- College Drive;
- Shoemaker Road;
- Walnut Street;
- Lincoln Avenue;
- North Evans Street;
- Nightingale Street;
- Jackson Street;
- Hale Street;
- North Evans Street;
- Grace Street;
- Beech Street; and
- Sunset Street.
Photo by Travels With The Post